This contract includes Work at two (2) Sewage Pumping Stations (SPS) in the City of Toronto, namely, Island Road SPS and Skydome SPS. There are the following Works, in general, to be performed at these SPS:,Island Road SPS:,- Approximately 272 m of Twin 200 mm diameter Forcemains installation on Island Road from the SPS to the proposed Discharge Maintenance Hole at Brownfield Gardens, and,- Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station.,Skydome SPS:,- Approximately 190 m of 300 mm diameter of Primary Forcemain on Navy Wharf Ct and Blue Jays Way including proposed Discharge Maintenance Hole, and Valve Chambers,,- Approximately 100 m of Twin 350 mm diameter Forcemains on Blue Jays Way including the installation at the underside of the Bridge over the Metrolinx Tracks and Expansion Joint Chambers, and,- Processing, Structural, and Electrical Work inside the Pumping Station.,Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to the commencement of the Work, abandonment and/or removal of existing pipes, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. TOBids Document Number: 4306117175 | Type: RFT | Division(s): Toronto Water