Detail design and site services during construction and post-construction for process improvement and energy optimization of raw water and treated water pumps and valve control improvements at the R.C. Harris Water Treatment Plant, including: Installation of VFD on raw water, treated water and backwash pumps; Replacement of a backwash pump; Optimization of the process control; Retrofit of the pump operation display. TOBids Document Number: 4394844139 | Type: RFP | Division(s): Engineering & Construction Services