This RFT is an invitation by the City: to prospective Suppliers to submit bids for the performance of the Work, as further described in Part 3 (DRAWINGS AND SPECIFICATIONS) and the Contract (the "Project"). In brief summary, the Work for the MRF Building Upgrades Project at the Commissioners Transfer Station located at 400 Commissioners Street, Toronto, ON Canada includes but is not limited to: • Remove and replace overhead doors. • Remove and replace ceiling mounted electrical heaters. • Remove and replace ceiling mounted exhaust fans. • Improvements to the fire alarm system, power supply and new receptacles inside the main building and loading dock. • Installation of loading dock area foundation system, cladding and roofing system, structural steel superstructure and new mechanical, fire protection and electrical systems, and other miscellaneous works as detailed complete within the Specifications and Drawings TOBids Document Number: 4619099831 | Type: RFT | Division(s): Solid Waste Management Services