Project Description - In general, the work to be completed on University Avenue includes: • Replacement of the existing 300 mm and 600 mm diameter watermains across Dundas Street West using Cap and Lag or approved equivalent trenchless method • Replacement of the existing 150 mm diameter Cast Iron (CI) watermain (1876) with a new 300 mm diameter Molecularly Oriented Polyvinyl Chloride (PVCO) watermain for a distance of approximately 930 m and water service transfer to new watermain from College Street to 120 m north of Queen Street West. • Replacement of the existing 600 mm diameter CI watermain (1873) with a new 600 mm diameter butt welded steel pipe with concrete encasement and cement lining watermain for a distance of approximately 930 m from College Street to 120 m north of Queen Street West. • Transfer water service to new watermain. • Replacement of all substandard water services. • Major road resurfacing between College Street to 120 m north of Queen Street West, from curb-to curb, including all required traffic control, drainage, curb alignment modification, and any other requirements to facilitate road resurfacing works. • Intersection improvements and bikeway improvements from College Street to Dundas Street West • Road Classification: Major TOBids Document Number: 4725747983 | Type: RFT | Division(s): Engineering & Construction Services